問題

NHP2400_2026-2027_Smart_Infant_Crib_Project_Planning_Report.docx

NHP2400_2026-2027_Smart_Infant_Crib_Project_Planning_Report帮我修改这份中的甘特图,并且请生成一个新的word文档 ,并且其他内容都不要进行修改,就只要修改甘特图,请输出Mermaid Gantt代码,为NHP2400本科项目:Design of Monitoring and Intelligent Control System for Smart Infant Crib Based on STM32。
要求:

  1. 项目时间范围:2026‑10‑01 至 2027‑05‑15;

  2. 区分:Work package(摘要大工作包,绿色)、Task(子任务,蓝色)、Contingency缓冲任务(黄色);

  3. 任务顺序逻辑:先文献调研,再做风险评估与伦理审查;固件与机械执行器原型部分并行开发;模块测试和开发阶段并行,不全等全部开发结束再测试;末尾设置专门应急缓冲WP7;

  4. 设置6个里程碑:
    M1 :milestone, m1, 2026‑11‑01, 0d : M1‑Project planning submission
    M2 :milestone, m2, 2026‑12‑18, 0d : M2‑System design freeze
    M3 :milestone, m3, 2027‑02‑19, 0d : M3‑Prototype built
    M4 :milestone, m4, 2027‑03‑26, 0d : M4‑Integrated test complete
    M5 :milestone, m5, 2027‑04‑23, 0d : M5‑Draft report
    M6 :milestone, m6, 2027‑05‑07, 0d : M6‑Final submission & presentation

  5. 全部任务清单:
    WP1 Planning(WorkPackage)
     1.1 Project planning report
     1.2 Risk assessment
     1.3 Ethics & safety review

WP2 Research(WorkPackage)
 2.1 Literature & safe‑sleep review
 2.2 Sensor/component investigation
 2.3 Requirements & acceptance criteria

WP3 Design(WorkPackage)
 3.1 System architecture
 3.2 Hardware circuits & power
 3.3 Control logic & UI design

WP4 Development(WorkPackage)
 4.1 STM32 firmware
 4.2 Wi‑Fi/dashboard integration
 4.3 Mechanical/actuator prototype

WP5 Test(WorkPackage)
 5.1 Module tests
 5.2 Integrated functional tests
 5.3 Safety/reliability tests

WP6 Report / Presentation(WorkPackage)
 6.1 Results analysis
 6.2 Final report
 6.3 Final presentation

WP7 Contingency(WorkPackage,黄色缓冲)
 7.1 Defect correction / retest
 7.2 Submission buffer / final QA

  1. 配色设置:
    section Work‑Package 用 #60ad5e(绿色)
    section Task 用 #4488dd(蓝色)
    section Contingency 用 #f2bc3c(黄色)

  2. 输出仅输出完整可直接渲染的Mermaid gantt代码块,不要多余解释文字;

  3. 开启显示日期,横轴按月显示;里程碑标记在对应时间点;

  4. 逻辑约束:风险评估、伦理审查任务,放在文献综述任务启动之后;4.1固件和4.3机械原型存在并行时间;5.1模块测试与WP4开发并行。

思考

Designing the chart

I’m translating the schedule into Mermaid while mapping work packages, tasks, and contingency to distinct visual styles. I’ll preserve dates, dependencies, milestones, and the requested green, blue, and yellow color scheme.

Designed the chart

思考

Building the project chart

I’m arranging the landscape Gantt so work-package summaries appear green, individual tasks blue, contingency work yellow, and milestones clearly marked. I’m also keeping the timeline compact enough to fit beside the existing portrait pages.

思考

Inspected, analyzed, and updated the Word report with a resized Gantt chart

Worked for 3m 14s

回答

[新Word文档] (NHP2400_2026-2027_Smart_Infant_Crib_Project_Planning_Report.docx)

mermaid
%%{init: { "theme": "base", "themeVariables": { "fontFamily": "Arial", "taskBkgColor": "#4488dd", "taskBorderColor": "#2f67ad", "taskTextColor": "#ffffff", "activeTaskBkgColor": "#60ad5e", "activeTaskBorderColor": "#3f8a3d", "activeTaskTextColor": "#ffffff", "critBkgColor": "#f2bc3c", "critBorderColor": "#c99113", "critTextColor": "#222222", "gridColor": "#dddddd", "todayLineColor": "#777777" } }}%% gantt title NHP2400 - Design of Monitoring and Intelligent Control System for Smart Infant Crib Based on STM32 dateFormat YYYY-MM-DD axisFormat %b %Y tickInterval 1month todayMarker off section WP1 Planning WP1 Planning :active, wp1, 2026-10-01, 2026-11-13 1.1 Project planning report :t11, 2026-10-01, 2026-10-31 1.2 Risk assessment :t12, 2026-10-12, 2026-11-06 1.3 Ethics & safety review :t13, 2026-10-19, 2026-11-13 section WP2 Research WP2 Research :active, wp2, 2026-10-01, 2026-11-20 2.1 Literature & safe-sleep review :t21, 2026-10-01, 2026-11-06 2.2 Sensor/component investigation :t22, 2026-10-19, 2026-11-13 2.3 Requirements & acceptance criteria :t23, 2026-11-02, 2026-11-20 section WP3 Design WP3 Design :active, wp3, 2026-11-16, 2026-12-18 3.1 System architecture :t31, 2026-11-16, 2026-11-27 3.2 Hardware circuits & power :t32, 2026-11-23, 2026-12-11 3.3 Control logic & UI design :t33, 2026-11-30, 2026-12-18 section WP4 Development WP4 Development :active, wp4, 2026-12-19, 2027-02-19 4.1 STM32 firmware :t41, 2026-12-19, 2027-02-19 4.2 Wi-Fi/dashboard integration :t42, 2027-01-18, 2027-02-19 4.3 Mechanical/actuator prototype :t43, 2027-01-04, 2027-02-12 section WP5 Test WP5 Test :active, wp5, 2027-01-18, 2027-03-26 5.1 Module tests :t51, 2027-01-18, 2027-02-26 5.2 Integrated functional tests :t52, 2027-02-15, 2027-03-12 5.3 Safety/reliability tests :t53, 2027-03-08, 2027-03-26 section WP6 Report / Presentation WP6 Report / Presentation :active, wp6, 2027-03-22, 2027-05-07 6.1 Results analysis :t61, 2027-03-22, 2027-04-09 6.2 Final report :t62, 2027-03-29, 2027-05-07 6.3 Final presentation :t63, 2027-04-12, 2027-05-07 section WP7 Contingency WP7 Contingency :crit, wp7, 2027-04-24, 2027-05-15 7.1 Defect correction / retest :crit, t71, 2027-04-24, 2027-05-07 7.2 Submission buffer / final QA :crit, t72, 2027-05-01, 2027-05-15 section Milestones M1-Project planning submission :milestone, m1, 2026-11-01, 0d M2-System design freeze :milestone, m2, 2026-12-18, 0d M3-Prototype built :milestone, m3, 2027-02-19, 0d M4-Integrated test complete :milestone, m4, 2027-03-26, 0d M5-Draft report :milestone, m5, 2027-04-23, 0d M6-Final submission & presentation :milestone, m6, 2027-05-07, 0d

問題

屏幕截图 2026-10-07 141202.png
屏幕截图 2026-10-07 141310.png

帮我把第一张图片做成格式与第二张图一样,要求第一个里面的内容不要修改,把第一张图片内容,填入第二张图中,生成一个新的图片,要制作出与第二张图格式一样的表格,边上图例的也要一致,颜色也要一致

畫圖

Gantt Chart 2026–2027 Project Timeline