NHP2400_2026-2027_Smart_Infant_Crib_Project_Planning_Report帮我修改这份中的甘特图,并且请生成一个新的word文档 ,并且其他内容都不要进行修改,就只要修改甘特图,请输出Mermaid Gantt代码,为NHP2400本科项目:Design of Monitoring and Intelligent Control System for Smart Infant Crib Based on STM32。
要求:
项目时间范围:2026‑10‑01 至 2027‑05‑15;
区分:Work package(摘要大工作包,绿色)、Task(子任务,蓝色)、Contingency缓冲任务(黄色);
任务顺序逻辑:先文献调研,再做风险评估与伦理审查;固件与机械执行器原型部分并行开发;模块测试和开发阶段并行,不全等全部开发结束再测试;末尾设置专门应急缓冲WP7;
设置6个里程碑:
M1 :milestone, m1, 2026‑11‑01, 0d : M1‑Project planning submission
M2 :milestone, m2, 2026‑12‑18, 0d : M2‑System design freeze
M3 :milestone, m3, 2027‑02‑19, 0d : M3‑Prototype built
M4 :milestone, m4, 2027‑03‑26, 0d : M4‑Integrated test complete
M5 :milestone, m5, 2027‑04‑23, 0d : M5‑Draft report
M6 :milestone, m6, 2027‑05‑07, 0d : M6‑Final submission & presentation
全部任务清单:
WP1 Planning(WorkPackage)
1.1 Project planning report
1.2 Risk assessment
1.3 Ethics & safety review
WP2 Research(WorkPackage)
2.1 Literature & safe‑sleep review
2.2 Sensor/component investigation
2.3 Requirements & acceptance criteria
WP3 Design(WorkPackage)
3.1 System architecture
3.2 Hardware circuits & power
3.3 Control logic & UI design
WP4 Development(WorkPackage)
4.1 STM32 firmware
4.2 Wi‑Fi/dashboard integration
4.3 Mechanical/actuator prototype
WP5 Test(WorkPackage)
5.1 Module tests
5.2 Integrated functional tests
5.3 Safety/reliability tests
WP6 Report / Presentation(WorkPackage)
6.1 Results analysis
6.2 Final report
6.3 Final presentation
WP7 Contingency(WorkPackage,黄色缓冲)
7.1 Defect correction / retest
7.2 Submission buffer / final QA
配色设置:
section Work‑Package 用 #60ad5e(绿色)
section Task 用 #4488dd(蓝色)
section Contingency 用 #f2bc3c(黄色)
输出仅输出完整可直接渲染的Mermaid gantt代码块,不要多余解释文字;
开启显示日期,横轴按月显示;里程碑标记在对应时间点;
逻辑约束:风险评估、伦理审查任务,放在文献综述任务启动之后;4.1固件和4.3机械原型存在并行时间;5.1模块测试与WP4开发并行。
[新Word文档] (NHP2400_2026-2027_Smart_Infant_Crib_Project_Planning_Report.docx)
mermaid%%{init: { "theme": "base", "themeVariables": { "fontFamily": "Arial", "taskBkgColor": "#4488dd", "taskBorderColor": "#2f67ad", "taskTextColor": "#ffffff", "activeTaskBkgColor": "#60ad5e", "activeTaskBorderColor": "#3f8a3d", "activeTaskTextColor": "#ffffff", "critBkgColor": "#f2bc3c", "critBorderColor": "#c99113", "critTextColor": "#222222", "gridColor": "#dddddd", "todayLineColor": "#777777" } }}%% gantt title NHP2400 - Design of Monitoring and Intelligent Control System for Smart Infant Crib Based on STM32 dateFormat YYYY-MM-DD axisFormat %b %Y tickInterval 1month todayMarker off section WP1 Planning WP1 Planning :active, wp1, 2026-10-01, 2026-11-13 1.1 Project planning report :t11, 2026-10-01, 2026-10-31 1.2 Risk assessment :t12, 2026-10-12, 2026-11-06 1.3 Ethics & safety review :t13, 2026-10-19, 2026-11-13 section WP2 Research WP2 Research :active, wp2, 2026-10-01, 2026-11-20 2.1 Literature & safe-sleep review :t21, 2026-10-01, 2026-11-06 2.2 Sensor/component investigation :t22, 2026-10-19, 2026-11-13 2.3 Requirements & acceptance criteria :t23, 2026-11-02, 2026-11-20 section WP3 Design WP3 Design :active, wp3, 2026-11-16, 2026-12-18 3.1 System architecture :t31, 2026-11-16, 2026-11-27 3.2 Hardware circuits & power :t32, 2026-11-23, 2026-12-11 3.3 Control logic & UI design :t33, 2026-11-30, 2026-12-18 section WP4 Development WP4 Development :active, wp4, 2026-12-19, 2027-02-19 4.1 STM32 firmware :t41, 2026-12-19, 2027-02-19 4.2 Wi-Fi/dashboard integration :t42, 2027-01-18, 2027-02-19 4.3 Mechanical/actuator prototype :t43, 2027-01-04, 2027-02-12 section WP5 Test WP5 Test :active, wp5, 2027-01-18, 2027-03-26 5.1 Module tests :t51, 2027-01-18, 2027-02-26 5.2 Integrated functional tests :t52, 2027-02-15, 2027-03-12 5.3 Safety/reliability tests :t53, 2027-03-08, 2027-03-26 section WP6 Report / Presentation WP6 Report / Presentation :active, wp6, 2027-03-22, 2027-05-07 6.1 Results analysis :t61, 2027-03-22, 2027-04-09 6.2 Final report :t62, 2027-03-29, 2027-05-07 6.3 Final presentation :t63, 2027-04-12, 2027-05-07 section WP7 Contingency WP7 Contingency :crit, wp7, 2027-04-24, 2027-05-15 7.1 Defect correction / retest :crit, t71, 2027-04-24, 2027-05-07 7.2 Submission buffer / final QA :crit, t72, 2027-05-01, 2027-05-15 section Milestones M1-Project planning submission :milestone, m1, 2026-11-01, 0d M2-System design freeze :milestone, m2, 2026-12-18, 0d M3-Prototype built :milestone, m3, 2027-02-19, 0d M4-Integrated test complete :milestone, m4, 2027-03-26, 0d M5-Draft report :milestone, m5, 2027-04-23, 0d M6-Final submission & presentation :milestone, m6, 2027-05-07, 0d
帮我把第一张图片做成格式与第二张图一样,要求第一个里面的内容不要修改,把第一张图片内容,填入第二张图中,生成一个新的图片,要制作出与第二张图格式一样的表格,边上图例的也要一致,颜色也要一致